ENVIRONMENTAL SERVICES
FLEXIBLE. DEPENDABLE. ON-SITE ENGINEERING.
ENVIRONMENTAL SITE ASSESSMENTESA
PHASE I & PHASE II (O.Reg 153/04)
King EPCM provides clients with an expert environmental engineering team to quickly tackle small projects, or to expertly handle the most complex projects. As governed by O.Reg 153/04, all ESA Phase I and II reports are overseen by a Qualified Professional.Phase I - A quick review, focused on identifying Potentially Contaminating Activities within the area of interest.Phase II - Physical sampling and chemical analysis of soil and groundwater, for possible contaminates identified in Phase I. King EPCM also provides remediation of confirmed contaminates found in Phase II. Various methods include: in-situ chemical pumping, ex-situ chemical stockpile, physical removal, etc.
LICENSED WELL CONTRACTOR (O.Reg 903)
King EPCM is proud to be a fully licensed Well Contractor (O.Reg 903). We specialize in shallow environmental testholes, with a up to 20ft in depth. Our specialized tools allow us to quickly construct monitoring wells in tight areas difficult for standard drills, and does not require pre-defined private/public locates.
SOIL & GROUNDWATER TESTING
Contaminated soils remain one of the largest issues for private land owners and for land developers. There have been many serious court cases in recent years regarding illegal dumping of contaminated soil, or intentional omission of contaminates at legal soil dumps. Many rural townships have by-laws that require the chemical testing of soil before large loads of soil can be transported & received. King EPCM offers unsurpassed flexibility to help clients in need of dumping soil, or to legally receive soils on their property.
EXCESS SOIL MANAGEMENT (O.Reg 406/19)
In December 2019, Ministry of Environment, Conservation, and Parks (MECP) released a new regulation under the Environmental Protection Act, titled “On-Site and Excess Soil Management” to support improved management of excess construction soil. These changes reduce soil management costs, while protecting human health and the environment.King EPCM is ready to assist the building & development industry in the new O.Reg 406/19 and 2019 Soil Rules conditions:
-
Project Qualified Person (QP), as identified in O.Reg 153/04
-
Preparation of "Assessment of Past Uses"
-
Preparation of a "Soil Characterization Report"
-
Preparation and implementation of "Sampling & Analysis Plan"
-
Preparation of an "Excess Soil Destination Assessment Report"
-
Development of modified site-specific standards for soil reuse sites, using MECP "Beneficial Reuse Assessment Tool (BRAT)"