Professional engineered septic system design for homes, cottages and businesses across Ontario. Septic design, soil T-time testing and the septic permit, all done by one firm — for new and replacement systems.

The basics

What an engineered septic design involves

Outside a sewered area, every home and business needs its own sewage system, and in Ontario that system has to be designed to suit the lot and the soil, then approved before it is built. The design is what the approval, and the installer, work from.

An engineered septic design starts with a site assessment and a soil T-time test, which measures how quickly the ground drains. From that we size the tank and the leaching bed to the building, prepare permit-ready drawings, and submit the septic permit application to the authority that covers your property. Where the lot or soil needs it, we design an advanced treatment system instead of a conventional bed.

Many septic designers do not do the soil test themselves: the T-time is handed to a separate geotechnical company, which you have to schedule and wait for. King EPCM does the design, the T-time test and the permit application in-house, so the whole job is one scope with one point of contact.

We provide this for new homes and additions on rural and large-lot properties, for failed or ageing systems that need replacing, and for commercial and industrial properties.

  • Site assessment
    Lot, setbacks, water table and where a bed can go
  • Soil (T-time) testing
    Done by our own team, not outsourced — the number that sizes the bed
  • System sizing & design
    Tank, bed and treatment matched to the building and the soil
  • Septic permit application
    Prepared and submitted to your local authority
  • Approval & installation support
    Reviewer questions answered, installer supported
Technical illustration of a residential septic system in Ontario, shown in cutaway on a rural lot: wastewater from the house flows to a two-compartment septic tank for primary treatment, through an effluent filter and distribution box, into a leaching bed (shown here as a generic shallow buried trench; the bed type is chosen for each property) where effluent percolates into native soil (topsoil, sandy loam, clay) above the groundwater table. Callouts show the setbacks a design must respect: 15 m or 30 m from a drilled well, 15 m from a watercourse plus floodplain and conservation limits, and 3 m from trees; and the soil T-time test, measured on site by King EPCM's own crew, which sets the size of the bed. A side panel lists the four system options by priority: lowest cost (conventional or passive sand filter bed), best value (aerobic treatment unit with a small bed), highest quality with a small shed visible (biofilter in an above-ground shed) and highest quality with nothing visible (buried biofilter). A bottom strip shows the six-step design and permit process: sewer check, priorities form, site visit for T-time, well check and groundwater, options, detailed design, and permit issued by the building department, health unit or conservation authority; systems over 10,000 L/day are approved by the MECP.
A residential septic system in cutaway, with the setbacks and soil data a design depends on, the four system options by priority, and the six-step design and permit process. The bed shown is a generic example (a shallow buried trench); the bed type is chosen for each property. We design the cheapest, best-quality bed that fits the yard, and where the usable area is not enough we add treatment technology to make up for it.
Side by side

New, replacement and large systems

 New systemHome, cottage, additionReplacement systemFailed or ageing bedLarge systemOver 10,000 L/day
WhenA new building, or an addition that adds bedrooms or flow, on a lot with no municipal sewerThe existing bed has failed, is at the end of its life, or no longer suits the buildingCommercial, industrial or institutional flows above the Building Code threshold
What we doSite assessment, T-time test, sizing, design, permit applicationRe-assess the site and soil, design the replacement, apply for the new permitHydrogeological assessment, system design and the provincial approval application
Who approves itYour local principal authority — depending on the municipality, the building department, the health unit or the conservation authorityThe Ministry of the Environment, Conservation and Parks (MECP), through an Environmental Compliance Approval (ECA)
Governing rulesOntario Building Code, Part 8Ontario Water Resources Act — see our LSSDS guide
  • 1 · Do you need a septic system at all?
    We first check whether a municipal sanitary sewer is available. If it is, connecting is usually the answer
  • 2 · New system or retrofit
    Where a system exists, we check whether it has the capacity, or can be extended, before designing new
  • 3 · Your priorities and your yard
    A short online form: what matters most to you, where you would and would not want the system, your well, photos and drawings
  • 4 · Site visit: T-time and well check
    Our own crew tests the soil, checks the well and records groundwater and site constraints
  • 5 · Options
    We size the system, pick the possible bed locations and give you up to three system options matched to your priority
  • 6 · Detailed design and permit
    Site plan, cross-sections, calculations and the T-time report, reviewed, then submitted to your local authority
How it works

From site visit to approved permit

One scope covers the field work, the engineering and the paperwork, so you are not coordinating a soil tester, a designer and a permit expediter separately. Before anything is drawn we confirm you actually need a septic system, and whether an existing one can be kept.

The T-time is the number everything else hangs on. It is the soil’s percolation time in minutes per centimetre: a low T-time means fast-draining soil and a smaller bed, a high T-time means slow soil and a larger bed or an alternative system. Our own field team measures it on site, along with the well location, groundwater and the setbacks that limit where a bed can go, so the design fits the ground it will sit in. Read our guide to percolation tests, T-time and infiltration rates.

You choose the trade-off. Septic systems range from a conventional in-ground or raised bed to advanced treatment units with nothing visible above ground. Our starting point is always the cheapest, best-quality bed that fits your yard; where the usable area is not enough, we add treatment technology to make up for it. Your priorities form tells us whether lowest cost, best value or highest quality matters most, and we present up to three options that fit the lot and the soil, so you decide with the costs and the look of the yard in front of you.

Who issues the permit varies by municipality: it may be the building department, the public health unit or the conservation authority. We confirm the right authority for your property, assemble the permit package and prepare the application to its requirements.

When it comes up

Typical situations

Click a card to see how we help.

Building on a rural or large lot

A new home or cottage where there is no municipal sewer, or an addition to a house with an existing septic system, and the building permit needs a septic permit first.

How we help →

How we help

We assess the lot, test the soil, size and design the system (or check whether the existing system can take the addition), and submit the septic permit application so the building permit can proceed.

← Back

Replacing a failed system

A bed that is backing up, ponding or past its life. A replacement needs a new design and a new permit.

How we help →

How we help

We re-assess the site and soil, design the replacement system to suit what is there now, and handle the permit application.

← Back

A commercial or industrial property

A business, plaza or facility outside a sewered area, with larger and more complex flows.

How we help →

How we help

We confirm whether the flow stays under the Building Code or crosses the 10,000 L/day line, then design and permit the system accordingly.

← Back
Why King EPCM

Why work with us on this

A septic design is only as good as the soil data under it and the approval it earns. Most design firms do not do the soil test themselves and bring in a separate geotechnical company for the T-time. King EPCM does septic design, T-time testing and permitting together: our own crew tests the soil, so the bed is sized to measured ground, not an assumption, and we prepare the permit application and deal with the reviewing authority ourselves.

Our designs are engineered, prepared by a licensed P.Eng.: reliable, compliant and cost-effective, tailored to the property conditions and the regulatory requirements. Because civil design, geotechnical and hydrogeology sit under one roof, the same team can take a project from a simple residential bed to a large system that needs a provincial approval.

  • Engineered by a P.Eng.
    Reliable, compliant, cost-effective, and tailored to the lot and the rules.
  • T-time done in-house
    Our own field crew, not a subcontracted geotechnical firm, so no hand-off and no waiting on a third company.
  • Permits handled
    We prepare the application and respond to the reviewing authority, whichever one covers your property.
  • You choose the trade-off
    Up to three system options matched to your priority: lowest cost, best value or highest quality.
  • Small to large
    Residential beds through to commercial, industrial and large subsurface systems.
  • Local and established
    Based in Markham since 2019, serving the GTA and all of Ontario.
Common questions

Quick answers

Do I need an engineer for a septic design?

Ontario's Building Code allows some small residential systems to be designed by a licensed sewage system designer rather than an engineer. In practice, an engineered design is what most building departments, health units and lenders expect for a new or replacement system, and it is the usual route for commercial, industrial and multi-unit properties. Large systems over 10,000 litres per day are approved by the province and need supporting studies prepared by a P.Eng. or P.Geo. King EPCM provides engineered septic designs for all of these.

What is a T-time or percolation test?

A percolation test measures how quickly water moves through the soil on your property. For septic design the result is expressed as a T-time, in minutes per centimetre. A lower T-time means faster-draining soil. The T-time sets the size and type of leaching bed your property needs, so it is one of the first things we measure during the site visit. More in our T-time guide.

Who issues the septic permit?

It varies by municipality. Depending on where the property is, septic permits are issued by the local building department, the public health unit or the conservation authority. We confirm the right authority for your property and prepare the application to its requirements.

How long does septic approval take?

Once the application is submitted, approval typically takes about 2 to 4 weeks. It depends on the municipality and on other factors, in particular whether a conservation authority permit is also needed. We confirm the likely timeline for your property when we quote.

What types of septic system do you design?

Whatever the lot and the soil allow: conventional in-ground and raised filter beds and absorption trenches, Type A beds, shallow buried trenches, and advanced treatment units such as Eljen GSF, Bionest and Waterloo biofilter systems, with or without a visible above-ground unit. A holding tank is designed only where nothing else is permitted. We present the options that fit your property and let you choose on cost, maintenance and the look of the yard.

Can you design a replacement septic system?

Yes. Replacing a failed septic bed or system needs a new design and a new permit, and King EPCM handles both. We assess the site and soil, design the replacement system, and prepare the permit application.

General information only — not engineering advice for a specific property, and no substitute for the current Ontario Building Code or the requirements of the authority having jurisdiction. Confirm the rules for your site with a qualified professional.

Learn more

Related guides & resources

Building, replacing or buying on septic?

Send us the address and we'll tell you what the design and permit will involve — with a clear quote within 3 business days.

Request a Quote

Or call 416-342-3001

Request a quote

Get a septic design quote

Tell us the property address, whether it is a new or replacement system, and what you are building. We'll confirm the scope and send you a clear quote within 3 business days.

Prefer to talk?

Call us during business hours.

416-342-3001

Or email

sales@KingEPCM.com

Office

3780 14th Avenue, Unit 211
Markham, ON L3R 9Y5

A survey, site plan, floor plan or the municipality's letter. PDF, Word, Excel, images or ZIP, up to 4 MB each.

Prefer email? Write to sales@KingEPCM.com, or call 416-342-3001.